How to Install & Commission the ZONESUN ZS-SCF1 Sauce & Honey Filling Machine

ZONESUN ZS-SCF1 Sauce Honey Weighing and Filling Machine

The ZONESUN ZS-SCF1 is an automatic weighing and quantitative filling machine designed for paste and viscous liquids β€” including honey, ketchup, chili sauce, plum sauce, doubanjiang, and peanut sesame sauce. With its precision weighing system and easy-to-operate controls, it delivers fast and consistent filling for small-scale food packaging operations. This guide walks you through the complete installation and commissioning process.

πŸ‘‰ View Product Page


🎬 Commissioning Video

Watch the full commissioning and operation demo before you begin:


πŸ“¦ Step 1: Unpacking & Inspection

ZONESUN ZS-SCF1 Filling Machine
  • Remove all packaging materials and protective foam carefully.
  • Inspect the machine frame, hopper, filling nozzle, weighing platform, and control panel for any shipping damage.
  • Verify all accessories are included: power cable, spare parts kit, filling nozzles, and operation manual.
  • Place the machine on a flat, stable surface close to your power outlet and product supply.

⚑ Step 2: Electrical Connection

ZS-SCF1 control panel
  • Connect the machine to a standard power outlet β€” ensure voltage matches your local supply specification.
  • Ensure the main switch is OFF before making any electrical connections.
  • Ground the machine properly to protect the weighing sensor from electrical interference.
  • Power on and verify the control panel display initializes correctly with no error codes.

🍯 Step 3: Hopper & Nozzle Setup

Hopper and nozzle setup
  • Install the appropriate filling nozzle for your product viscosity β€” use a wider nozzle for thick pastes like doubanjiang or peanut sauce.
  • Attach the hopper securely and confirm all seals and gaskets are in place to prevent leaks.
  • For heated products (e.g., honey): allow the hopper heating element to reach operating temperature before filling.
  • Fill the hopper with your product and check for smooth flow through the nozzle with no blockages.

βš–οΈ Step 4: Weighing Calibration

Weighing calibration
  • Place an empty container on the weighing platform and press Zero/Tare on the control panel.
  • Enter your target fill weight on the control panel (e.g., 500g, 1000g).
  • Run 5 test fills and weigh each output on an external scale to verify accuracy.
  • Adjust the fine-tuning parameter on the control panel if the fill weight is consistently over or under target.
  • Re-run tests until all 5 fills are within your acceptable tolerance (typically Β±2g).

▢️ Step 5: Trial Run & Speed Adjustment

Trial run
  • Start the machine at a low filling speed for the initial trial run.
  • Observe the full filling cycle: container placement β†’ nozzle open β†’ fill to target weight β†’ nozzle close β†’ container removal.
  • Check for dripping after the nozzle closes β€” adjust the anti-drip parameter if needed.
  • Gradually increase speed to your target production rate once accuracy and drip control are confirmed stable.

βœ… Final Checklist Before Production

ZS-SCF1 production ready
  • β˜‘ Machine placed on a stable, level surface.
  • β˜‘ Hopper filled and nozzle flow confirmed smooth.
  • β˜‘ Tare/zero set correctly for your container.
  • β˜‘ Fill weight accuracy verified within tolerance.
  • β˜‘ Anti-drip function confirmed working.
  • β˜‘ Operator trained on control panel and emergency stop.

πŸ”§ Common Troubleshooting Tips

Issue Possible Cause Solution
Inaccurate fill weight Weighing sensor not zeroed / vibration interference Re-tare the scale; place machine on stable surface
Nozzle dripping after fill Anti-drip parameter too low / nozzle worn Increase anti-drip value; inspect and replace nozzle
Product not flowing smoothly Product too viscous / nozzle blocked Warm up product; clean or replace nozzle
Control panel error code Sensor fault / power fluctuation Power cycle machine; check sensor connections
Inconsistent fill weights Hopper running low / air bubbles in product Refill hopper; stir product to remove air pockets

πŸ“ž Need Help?

Our technical support team is ready to assist with installation, commissioning, and after-sales service.

πŸ“§ Email: support@zonesunpro.com
🌐 Website: www.zonesunpro.com

Shop ZS-SCF1 Now
Kembali ke blog